520%Data sync speed
BIM Lightweight Compression
Exporting BIM through IFC normally means two hours (7,200 seconds) of parsing and compression. This runs in five, with the modeler's geometric and non-geometric data exported intact.
Research & Patents
Patented BIM 3D model data, doctoral and master's research, and three core technologies now running in the field.
Graduate Institute of Land Management, Feng Chia University
Department of Civil and Hydraulic Engineering, Feng Chia University
Patents in 4 jurisdictions
Granted in Taiwan, China, Japan, and Singapore




520%Data sync speed
Exporting BIM through IFC normally means two hours (7,200 seconds) of parsing and compression. This runs in five, with the modeler's geometric and non-geometric data exported intact.
100%Data integrity
Spatial positioning and mobile operations without a network — supporting repairs, equipment maintenance, asset counts, and on-site alignment against the BIM component library.
Positioning without a networkMobile field operations
8Passive design factors
Passive design tuned to the local climate — scientific analysis identifies the energy factors, simulation tests them, and efficiency measures follow from the results.
Analysis Tools
Work orders from request to completion, with site photos synced back to the model.
Service cycles set by equipment type, dispatched on time and kept on record.
Scan to count, verify against location, and update asset changes instantly.
Floor and room positioning with no network, so teams orient quickly on site.
Specs and attributes filed once, shared across design, construction, and operations.
From roof and facade to MEP equipment, a management register by building element.
Service life drives repair cycles and the reserve fund's accumulation curve.
Platform
Value-added integrations
Users & Interfaces
Subsystems & Functions